Please note that our office will be closed on the 7th of June for a sponsored walk.

Building Data Centres, Building Safety: Howler’s Role in Protecting High-Risk Construction Sites

data centre during construction phase

The demand for data centres in the UK is growing rapidly. With AI, cloud computing, and digital infrastructure expanding at pace, developers and contractors are under pressure to deliver vast, complex facilities at speed. 

But the construction phase brings unique challenges. These sites are large, high-value, high-risk environments, often with live switch-rooms and partially operational areas that need robust protection before permanent fire systems are live. 

That’s where Howler’s temporary fire and life safety solutions come in. 

Meeting the Challenge with Proven Solutions 
  1. 1. ProLink Wireless Alarm System
    • Reliable, robust wireless connectivity across vast areas. 
    • Ideal for the sheer scale of data centre projects, ensuring no blind spots in safety coverage. 

 

  1. 2. Wireless Detection with Magnetic Fixing Plates
    • Switch-rooms and data halls are often in use while construction continues. 
    • Quick, non-invasive deployment of wireless detectors gives immediate protection for live, high-value spaces. 

 

  1. 3. Extendipole Detectors
    • A simple but effective way to position detectors exactly where they’re needed. 
    • Flexible protection for evolving environments. 

 

  1. 4. Fire Alarm & Extinguisher SafetyHub
    • Mobile, robust, and highly visible. 
    • Keeps all fire equipment together in one accessible location — ensuring site compliance and rapid response in an emergency. 

 

  1. 5. ProLink First Aid Alarm Button
    • On sprawling sites where welfare facilities can be hundreds of metres away, quick access to first aid is essential. 
    • This system ensures incidents are reported immediately so support reaches operatives without unnecessary delay. 

 

  1. 6. First Aid SafetyHub with Defibrillator
    • Data centre builds cover vast areas — keeping defibrillators and first aid equipment within reach is essential. 
    • The British Heart Foundation recommends being within 90 seconds of a defib. The all-weather SafetyHub makes this possible, positioning life-saving kit exactly where the workforce is concentrated. 
Why It Matters 

Every data centre under construction represents millions of pounds of investment and hundreds of workers on site daily. Failures in fire safety don’t just cause delays — they can disrupt projects, damage reputations, and compromise safety. 

Howler provides scalable, adaptable, and compliant fire safety solutions that evolve with the site from groundbreaking to handover. 

When you’re building the infrastructure that will power the UK’s digital future, fire safety isn’t optional — it’s fundamental. 

Ready to Build Safer Data Centres? 

Work with Howler to protect your people, projects, and property.
✅ Faster, compliant installations
✅ Scalable protection that grows with your site
✅ Proven systems trusted on some of the UK’s most complex builds 

📞 Contact our team today to discuss how Howler can safeguard your next data centre project. 

Back to articles